Reference:
Y. Li,
J. Alende,
M. Cantoni, and
B. De Schutter,
"Decomposition of a fixed-profile load scheduling method for
large-scale irrigation channels," Proceedings of the 2010 IEEE
International Conference on Control Applications, Yokohama,
Japan, pp. 2166-2171, Sept. 2010.
Abstract:
The problem of fixed-profile load scheduling is considered for
large-scale irrigation channels. Based on the analysis of the special
structure of a channel under decentralised control, a predictive model
is built on a pool-by-pool basis and a decomposition strategy of the
scheduling problem is provided. The decomposition avoids excessive
memory requirements in building the predictive model of the controlled
plant and solving the formulated optimisation problem.
Online version of the
paper
Corresponding technical report:
pdf
file
(169 KB)